Structural, Engineers, Consultants, Consultancy, Geo-Technical, Developments, Residential, Commercial, Sustainable, Architects, Tall, Dynamics, Design, Complex, High Rise, Graduate, Senior Engineers, Strategic Advice, Feasibility, Concept,Ibis Gloucester

Ibis Gloucester Structural, Engineers, Consultants, Consultancy, Geo-Technical, Developments, Residential, Commercial, Sustainable, Architects, Tall, Dynamics, Design, Complex, High Rise, Graduate, Senior Engineers, Strategic Advice, Feasibility, Concept,

Ibis, Gloucester
The 5-storey, 127 bedroom hotel built by McGee is located on part of an old land-fill site and is constructed on piled foundations with a suspended reinforced concrete ground floor slab and vented sub-floor void to provide gas protection. The superstructure is of concrete cross-wall construction over an in-situ concrete transfer slab at first floor.

Detailed ground-modelling and cut-and-fill analysis was undertaken to optimise the building and car-park levels, and it was necessary to divert an existing deep sewer running across the site of the proposed new building.

Client:        Accor Hotels/McGee
Architect:          Leach Rhodes Walker Architects

Other Hotel Projects
Holiday Inn, Brentford Lock
Marlin Apart Hotel, London
Novotel, Liverpool
Ramada Jarvis, Heathrow
Holiday Inn, St Albans
Ibis Gloucester


Copyright 2008 © Manhire Associates | Privacy Policy | Products & Services of  PCW New Media | Sitemap